• Flow instruments

    Flow instruments30 Years of research and development allows Intra Automation to offer the best solutions for new and existing flow measurement problems. Intra Automation manufactures Flow Sensors according to customer requirements.

    More.. Flow instruments
  • Level instruments

    Level instrumentsMonitoring the Level data of your process is still one of the most important applications in process control. Intra Automation offers individual solutions that allows visual level monitoring of analogue and digital signals.

    More.. Level instruments

  • System components

    System componentsIntra Automations system components guarantee easy installation, compatibility with our products and easy data monitoring.

    More.. System components

  • Back..,0.back,0
  • 1. Flow instruments
    • Back..,1.back,0
    • 1.1. ITABAR Pitot Tube
    • 1.2. Ultrasonic Series
    • 1.3. Orifice Assemblies
    • 1.4. Venturi Tubes
    • 1.5. Flow Nozzles
    • 1.6. Sight Glasses
    • 1.7. Cone Flowmeter
    • 1.8. Wedge tube
  • 2. Level instruments
    • Back..,2.back,0
    • 2.1. ITA Magnetic Level Gauge
    • 2.2. Tank Level Transmitter / Switch
    • 2.3. Maglink Magnetic Tank Gauge
    • 2.4. Transparent Level Gauges
    • 2.5. Tubular Type Level Gauge
    • 2.6. Reflex Level Gauge
    • 2.7. Reflex gauge with integrated Heating/Cooling
    • 2.8. Illuminator Type Level Gauge
    • 2.9. Bicolor Level Gauges
    • 2.10. Boiler Steam Water Level Gauge
    • 2.11. Guided Wave Radar
    • 2.12. Transmitter for Liquid Level Interface and Density
  • 3. System components
    • Back..,3.back,0
    • 3.1. Purge Unit
    • 3.2. Flow Computers / Displays
    • 3.6. Accessories
    • 3.7. Head Transmitter
NEW: Our “Mini” with integrated temperature sensor! | 2011 Intra Automation 25 years in Grevenbroich | Christmas break between the 24th of December 2011 and the 2nd of January 2012 | Engineering Challenge Cup (ECC) May 7-14 | NEW: Our “Mini” with integrated temperature sensor! | 2011 Intra Automation 25 years in Grevenbroich | Christmas break between the 24th of December 2011 and the 2nd of January 2012 | Engineering Challenge Cup (ECC) May 7-14